A35 Bre.Be.Mi.
This is an important motorway for Lombardy and a fundamental initiative for the regional and local traffic flow and even more strategic in view of Expo 2015. 

The new road is used by thousands of vehicles on a daily basis and is used, among other things, to divert a large part of the traffic from existing routes: this is especially true of the A4, the busiest motorway in Europe.
Vitali’s intervention included the construction of the Bre-Be-Mi motorway link (starting from scratch) on the stretch running from Treviglio to Cassano d’Adda totalling 6.5 km. The total cost of the work contracted by BBM Consortium is around €16 million.
All technological equipment complies with the most advanced European safety standards, with numerous interventions of environmental integration, going well beyond the ordinary measures of mitigation and compensation but aimed at enhancing the surrounding environmental and landscape heritage.
Project data
Total length 62.1 km Ordinary road network 35 Km 
Total cost, 
Milions/Hours saved 6.8 milion GDP growth 382 milion