Brenner Motorway
Vitali has completed road maintenance work on the Brenner motorway in the Brenner-Rovereto North section. The work, along the entire carriageway, was divided into sections and consisted in deep milling of the existing pavement followed by a complete re-paving of the surface using sound absorbing asphalt (porous asphalt mixture) specifically designed to ensure high quality standards and a high degree of durability.