Lenna Bridge

Bergamo

Vitali has built the new bridge over the Brembo River, projected by eng. Mauro Eugenio Giuliani, downstream of the existing railway viaduct and connect Via Gozzi with Via dell’industria. It is an upper arch bridge without intermediate support in the Brembo, with a 3D structure skeleton (steel-concrete) and special reinforced concrete foundations. In addition to street lighting, night lighting for the new bridge was also provided.

The project provides the realisation of a new road, retaining walls in reinforced concrete covered with local stones, collection networks, rainfall disposal, a public electrical system, a street level intersection near the bridge, a link between the road and the new road, and, last but not least, a box-shaped flyover near Lenna in order to maintain the secondary roads.

L'intervento ha previsto la realizzazione di una nuova sede stradale, muri di sostegno in conglomerato cementizio armato rivestiti in pietra locale, la realizzazione di reti di raccolta e smaltimento acque meteoriche ed impianto di pubblica illuminazione, una intersezione a raso in prossimità del ponte, con il collegamento della strada preesistente al nuovo tracciato stradale e per ultimo, ma non meno importante la realizzazione di un sovrapasso scatolare a ridosso della spalla lato Lenna per il mantenimento della viabilità secondaria in essere.